1 Fair Hill Rd

Westfield, New Jersey

50% complete

Description

Details coming soon!

Location on map

See the latest updates

1 June 30, 2018
1-Fair-Hill-Dr-siding-complete-side-view

Electrical rough – in progress

Fireplace – installed

Landscaping walk through – done
Plumbing rough Inspection – passed

3 June 1, 2018
1-Faithill-Rd-exterior-siding-finished
  • Basement framing complete
  • Stairs installed
  • Hvac rough in progress
  • Electrical rough in progress
  • Plumbing rough in progress
  • Outside trim almost complete
  • Siding in progress
  • Cultered stone delivered
  • Walk though done for cabinets and vanities
  • Front porch block in progress
  • Floors in progress
  • Plumbing Electrical and AV walkthrough done
  • Fireplace ordered
  • Tile measurements done
5 February 28, 2018
1-fair-hill-rd-demolition
  • Demolition in progress
2 June 12, 2018
1-Fair-Hill-Dr-siding-complete
  • Siding and trim completed
  • Cultered stone almost complete
  • Hvac rough
  • Plumbing rough
  • Electrical rough almost complete
  • Fireplace installation on Monday
  • Tile measurements done
  • Trees removed
  • Basement soffets to start
  • Floors installed
4 May 15, 2018
1-fairhill-dr-front-view
  • Water and sewer inspection passed
  • Sheathing completed
  • Tyvek wrap in progress
  • Windows and roofing shingles installed
  • Gialluisi Homes custom trim and Azak in progress
  • Hvac rough starting to be followed
  • By electrical and plumbing rough
  • Stairs installed
6 February 26, 2018
1-fairhill-rd-new-construction
  • Getting ready for demolition
  • 1 June 30, 2018
    1-Fair-Hill-Dr-siding-complete-side-view

    Electrical rough – in progress

    Fireplace – installed

    Landscaping walk through – done
    Plumbing rough Inspection – passed

  • 2 June 12, 2018
    1-Fair-Hill-Dr-siding-complete
    • Siding and trim completed
    • Cultered stone almost complete
    • Hvac rough
    • Plumbing rough
    • Electrical rough almost complete
    • Fireplace installation on Monday
    • Tile measurements done
    • Trees removed
    • Basement soffets to start
    • Floors installed
  • 3 June 1, 2018
    1-Faithill-Rd-exterior-siding-finished
    • Basement framing complete
    • Stairs installed
    • Hvac rough in progress
    • Electrical rough in progress
    • Plumbing rough in progress
    • Outside trim almost complete
    • Siding in progress
    • Cultered stone delivered
    • Walk though done for cabinets and vanities
    • Front porch block in progress
    • Floors in progress
    • Plumbing Electrical and AV walkthrough done
    • Fireplace ordered
    • Tile measurements done
  • 4 May 15, 2018
    1-fairhill-dr-front-view
    • Water and sewer inspection passed
    • Sheathing completed
    • Tyvek wrap in progress
    • Windows and roofing shingles installed
    • Gialluisi Homes custom trim and Azak in progress
    • Hvac rough starting to be followed
    • By electrical and plumbing rough
    • Stairs installed
  • 5 February 28, 2018
    1-fair-hill-rd-demolition
    • Demolition in progress
  • 6 February 26, 2018
    1-fairhill-rd-new-construction
    • Getting ready for demolition
See more properties