2 Browning Rd,

Short Hills, New Jersey

50% complete

$2,149,000

Description

A house built to inspire!

This dreamy chalet located at 2 Browning Rd, Short Hills is an exhibition of style and luxury. Open spaces, large bedrooms, walk-in closets and lots of natural light are some of the features that define this home.

The interior color palette aims to match any style. The neutral shades create a relaxing atmosphere, contrasting the dark color of the hardwood floors. It is the perfect combination of elegance, comfort and functionality.

As the heart of the home, the kitchen serves multiple purposes. It is equipped with an amazing stainless steel Wolf appliances package, thus bringing a modern touch. Tall cabinets, lots of counter space and storage space, all these details make it the perfect place for cooking. The kitchen island is perfect for late breakfasts with your dear ones.

A beautiful open space plan connects the kitchen with the living room. It is the ideal place to gather your friends and family for special occasions.

On the exterior, the house features Hardi Plank siding and Azek trim. The backyard offers enough space to install a pool, a fire pit and still have room to plant some beautiful flowers!

Property Features

  • 1,600 sq ft basement
  • Hardi Plank siding
  • Azek exterior trim

Appliances

  • Wolf appliance package

Interior Amenities

  • 5 bedrooms
  • 6 bathrooms

Exterior Amenities

Neighborhood information

One of the safest neighborhoods in town.

Location on map

See the latest updates

1 April 13, 2018
2-browning-rd-exterior
  • Roofing, siding, windows & doors were installed
  • Finishing up the plumbing, HVAC and electric;
  • Hardwood floors installation was completed as well;
  • The basement slab was poured.
3 February 24, 2018
2-browning-rd-framing-complete
  • Framing and backfill complete
5 February 13, 2018
2-browning-rd-framing-front-view
  • Interior framing, roof rafters and exterior walls are near completion
7 January 31, 2018
2-browning-rd-first-floor
  • The first floor structural beam layout is being installed
9 January 29, 2018
2-browning-rd-foundation-walls-installation1
  • Foundation walls have arrived
2 March 23, 2018
2-browning-rd-siding-installation
  • Siding installation almost complete
4 February 21, 2018
2-browning-rd-backfill
  • Currently backfilling the foundation and leveling the property
6 February 5, 2018
2-browning-rd-second-floor-sheating
  • Second floor sheathing installation in progress
8 January 31, 2018
2-browning-rd-lumber-delivery
  • The lumber delivery has been dropped in
  • Installation of the sill plates around the top of the foundation walls to begin
10 January 25, 2018
2-browning-rd-footing-stone-installation
  • The footing stone has been installed
  • 1 April 13, 2018
    2-browning-rd-exterior
    • Roofing, siding, windows & doors were installed
    • Finishing up the plumbing, HVAC and electric;
    • Hardwood floors installation was completed as well;
    • The basement slab was poured.
  • 2 March 23, 2018
    2-browning-rd-siding-installation
    • Siding installation almost complete
  • 3 February 24, 2018
    2-browning-rd-framing-complete
    • Framing and backfill complete
  • 4 February 21, 2018
    2-browning-rd-backfill
    • Currently backfilling the foundation and leveling the property
  • 5 February 13, 2018
    2-browning-rd-framing-front-view
    • Interior framing, roof rafters and exterior walls are near completion
  • 6 February 5, 2018
    2-browning-rd-second-floor-sheating
    • Second floor sheathing installation in progress
  • 7 January 31, 2018
    2-browning-rd-first-floor
    • The first floor structural beam layout is being installed
  • 8 January 31, 2018
    2-browning-rd-lumber-delivery
    • The lumber delivery has been dropped in
    • Installation of the sill plates around the top of the foundation walls to begin
  • 9 January 29, 2018
    2-browning-rd-foundation-walls-installation1
    • Foundation walls have arrived
  • 10 January 25, 2018
    2-browning-rd-footing-stone-installation
    • The footing stone has been installed