21 Carol Rd

Westfield, New Jersey

40% complete

Description

Details coming soon!

See the latest updates

1 October 23, 2018
21-carol-rd-exterior-trim-in-progress-front-view
  • Floors – in progress;
  • HVAC rough – in progress;
  • Electrical rough – in progress;
  • Trim – in progress;
  • Tyvek wrap – in progress;
  • Plumbing rough – in progress
  • Front door – installed;
  • Cultered stone – in progress.
3 September 1, 2018
21-carol-rd-framing7
  • Framing continues.
5 August 22, 2018
21-carol-rd-starting-framing-first-floor2

First floor framing – in progress

2 October 5, 2018
  • Back fill completed;
  • Windows Installed;
  • Roof completed;
  • Hvac rough in progress;
  • Fireplaces Installed;
  • Silt fences Installed;
  • Water and sewer Installed;
  • Basement concrete poured;
  • Basement framing in progress.
  • Shower benches and shower floor pans framed
4 August 25, 2018
21-carol-rd-framing-first-floor2
  • – second floors joists, sill plates, microlams beams and plywood deck – in progress;
  • – second floor framing – to begin;
  • – basement concrete – to begin,
6 August 16, 2018
21-carol-rd-starting-framing2

Demolition and excavation – done;

Superior Wall installation – done;

The deck has been completed;

Underground plumbing and basement slab has been done and passed inspections.

  • 1 October 23, 2018
    21-carol-rd-exterior-trim-in-progress-front-view
    • Floors – in progress;
    • HVAC rough – in progress;
    • Electrical rough – in progress;
    • Trim – in progress;
    • Tyvek wrap – in progress;
    • Plumbing rough – in progress
    • Front door – installed;
    • Cultered stone – in progress.
  • 2 October 5, 2018
    • Back fill completed;
    • Windows Installed;
    • Roof completed;
    • Hvac rough in progress;
    • Fireplaces Installed;
    • Silt fences Installed;
    • Water and sewer Installed;
    • Basement concrete poured;
    • Basement framing in progress.
    • Shower benches and shower floor pans framed
  • 3 September 1, 2018
    21-carol-rd-framing7
    • Framing continues.
  • 4 August 25, 2018
    21-carol-rd-framing-first-floor2
    • – second floors joists, sill plates, microlams beams and plywood deck – in progress;
    • – second floor framing – to begin;
    • – basement concrete – to begin,
  • 5 August 22, 2018
    21-carol-rd-starting-framing-first-floor2

    First floor framing – in progress

  • 6 August 16, 2018
    21-carol-rd-starting-framing2

    Demolition and excavation – done;

    Superior Wall installation – done;

    The deck has been completed;

    Underground plumbing and basement slab has been done and passed inspections.