320 Mountain Ave

New Providence, NJ

100% complete

Description

A Colonial style beauty located in New Providence.

320 Mountain Ave is a spacious 4,000 sq ft home that features five bedrooms and six bathrooms. This home was built with nothing short of the highest quality – from foundation materials to door knobs, everything was carefully picked. The result? A luxurious and fully functional home that promises to provide a comfortable lifestyle.

The house enjoys a smart design. The first floor features an amazing open space layout, meant to enhance communication and sociability. The kitchen features a beautiful central island – perfect for late breakfasts – and modern stainless steel appliances.

Hardwood floors, neutral shades, statement mirrors and detailed craftsmanship are only a few details that make this home truly unique. The basement is also fully finished and it’s providing excellent living space.

On the exterior, this home features a spacious backyard and a beautiful landscape as well.

Property Features

  • 4,000 sq ft
  • 5 beds
  • 6 baths

Appliances

Location on map

See the latest updates

1 March 15, 2018
320-mountain-ave-finished-kitchen
  • Final touches on the interior are being completed
3 November 8, 2017
320-mountain-ave-sheetrock-installation1
  • Sheetrock installation has started
5 October 30, 2017
320-mountain-ave-rear-view
  • The exterior finishes are being installed
7 September 15, 2017
320-mountain-avenue-new-providence-house-for-sale1

Framing construction continues.Exterior sheathing and roofing Will be installed in the next few days.

2 November 14, 2017
320-mountain-ave-interior-sanding1
  • Sheetrock was completed
  • The finish sanding process continues
  • The exterior dry well has also been delivered
4 November 2, 2017
320-mountain-ave-exterior-trim-installation
  • Exterior trim installation of our Azek deluxe package is being installed
  • The James Hardie fiber cement to the exterior
  • Interior framing has been completed
  • Rough inspections and insulation to begin
6 October 9, 2017
320-mountain-ave-september
  • Roofing has been completed
  • Stairs have been delivered
  • Windows and doors scheduled to arrive 28 September
  • Underground preparations: backfilling of the perimeter and installation of the water and sewer lines
8 August 25, 2017
320-mountain-ave-foundation-3

Foundation preparation continues

  • 1 March 15, 2018
    320-mountain-ave-finished-kitchen
    • Final touches on the interior are being completed
  • 2 November 14, 2017
    320-mountain-ave-interior-sanding1
    • Sheetrock was completed
    • The finish sanding process continues
    • The exterior dry well has also been delivered
  • 3 November 8, 2017
    320-mountain-ave-sheetrock-installation1
    • Sheetrock installation has started
  • 4 November 2, 2017
    320-mountain-ave-exterior-trim-installation
    • Exterior trim installation of our Azek deluxe package is being installed
    • The James Hardie fiber cement to the exterior
    • Interior framing has been completed
    • Rough inspections and insulation to begin
  • 5 October 30, 2017
    320-mountain-ave-rear-view
    • The exterior finishes are being installed
  • 6 October 9, 2017
    320-mountain-ave-september
    • Roofing has been completed
    • Stairs have been delivered
    • Windows and doors scheduled to arrive 28 September
    • Underground preparations: backfilling of the perimeter and installation of the water and sewer lines
  • 7 September 15, 2017
    320-mountain-avenue-new-providence-house-for-sale1

    Framing construction continues.Exterior sheathing and roofing Will be installed in the next few days.

  • 8 August 25, 2017
    320-mountain-ave-foundation-3

    Foundation preparation continues