33 Fenimore Drive

Scotch Plains, NJ

70% complete

Description

A charming retreat located in Scotch Plains, NJ.

This beautiful 5,000 sq ft home will amaze you with its high-quality features and amenities. Built to provide a high-level of comfort, 33 Fenimore is the perfect combination of elegance and luxury.

The house features an open floor plan that unites the kitchen area with the family room. The kitchen features both modern and traditional elements, combined in a smart design. Stainless steel appliances bring the the contemporary touch, while the cabinets and the centered island ensure a classic look.

The common elements that the six bedrooms share are: dark hardwood floors and neutral color palettes. The master bedroom features a master bathroom and a spacious walk-in closet. There are five more bathrooms – each of them combining two important elements: beauty and functionality.

This beautiful home enjoys a spacious backyard, perfect for summer BBQs.

Property Features

  • 5,000 sq ft
  • 6 beds
  • 6 baths

Appliances

Details coming soon!

Interior Amenities

Details coming soon!

Exterior Amenities

Details coming soon!

Neighborhood information

Details coming soon!

Location on map

See the latest updates

1 June 30, 2018
33-fenimore-building-process2
  • Tile floors – completed
  • Tile walls – in progress
  • Stucco and stone – completed
  • Kitchen cabinets and vanities – in progress
  • Custom pantry and all closets – in progress
  • Hardwood floors – installed
  • Custom Courtyard pavers steps, columns and trim – done
3 January 31, 2018
33-fenimore-custom-home-in-progress-exterior4
  • The stucco installation is moving along
  • The exterior preparation continues with the scratch coat and first finishing coats.
5 November 20, 2017
33-fenimore-dr-roofing-shingles-completed2
  • Roofing Shingles , velox solar tubes, velox skylights and pella windows installed
  • Aluminium metal roofing sections ,Azek trim and vinyl soffets to be installed
7 October 23, 2017
33-fenimore-drive-framing-front-view3
  • Sheathing in progress for roof and house
  • Next: roof shingles and skylight installation
9 October 9, 2017
33-fenimore-framing-2
  • Framing continues
  • The roof lines are being assembled
2 June 1, 2018
33-fenimore-exterior-back-view
  • Fireplace installed
  • Garage doors installed
  • Stucco and stone in progress
  • Trim delivered and in progress
  • Gypsum creek floors installed
  • Radiant floors installed
  • Custom Courtyard with planters and water fountain in progress
  • Electrical power to house in progress
  • Interior doors ordered
  • Sheetrock completed
4 January 20, 2018
33-scotch-plains-exterior-stucco
  • Felt paper and wire mesh being fastened to the exterior breathing
6 October 25, 2017
33-fenimore-sheating-completed1
  • Sheathing completed
8 October 15, 2017
33-fenimore-drive-framing
  • First floor decking – completed
  • Framing continues
  • Roof line and gym over garage – in progress
  • Sump pumps – installed
10 August 4, 2017
33-feinmore-foundation

Working on the foundation

  • 1 June 30, 2018
    33-fenimore-building-process2
    • Tile floors – completed
    • Tile walls – in progress
    • Stucco and stone – completed
    • Kitchen cabinets and vanities – in progress
    • Custom pantry and all closets – in progress
    • Hardwood floors – installed
    • Custom Courtyard pavers steps, columns and trim – done
  • 2 June 1, 2018
    33-fenimore-exterior-back-view
    • Fireplace installed
    • Garage doors installed
    • Stucco and stone in progress
    • Trim delivered and in progress
    • Gypsum creek floors installed
    • Radiant floors installed
    • Custom Courtyard with planters and water fountain in progress
    • Electrical power to house in progress
    • Interior doors ordered
    • Sheetrock completed
  • 3 January 31, 2018
    33-fenimore-custom-home-in-progress-exterior4
    • The stucco installation is moving along
    • The exterior preparation continues with the scratch coat and first finishing coats.
  • 4 January 20, 2018
    33-scotch-plains-exterior-stucco
    • Felt paper and wire mesh being fastened to the exterior breathing
  • 5 November 20, 2017
    33-fenimore-dr-roofing-shingles-completed2
    • Roofing Shingles , velox solar tubes, velox skylights and pella windows installed
    • Aluminium metal roofing sections ,Azek trim and vinyl soffets to be installed
  • 6 October 25, 2017
    33-fenimore-sheating-completed1
    • Sheathing completed
  • 7 October 23, 2017
    33-fenimore-drive-framing-front-view3
    • Sheathing in progress for roof and house
    • Next: roof shingles and skylight installation
  • 8 October 15, 2017
    33-fenimore-drive-framing
    • First floor decking – completed
    • Framing continues
    • Roof line and gym over garage – in progress
    • Sump pumps – installed
  • 9 October 9, 2017
    33-fenimore-framing-2
    • Framing continues
    • The roof lines are being assembled
  • 10 August 4, 2017
    33-feinmore-foundation

    Working on the foundation