42 Colt Rd

Summit, NJ

100% complete

Description

An impressive 5,600 sq ft home, perfect for a growing family!

This beauty features 6 spacious bedrooms and 7.5 bathrooms. High-quality hardwood floors, carefully picked color palettes and handcrafted woodwork are just some of the elements that make this home special.

42 Colt Rd is a two-story Colonial style home, located in a beautiful neighborhood in Summit. The first floor welcomes you into a beautiful open space flooded with natural light. The neutral colors on the walls create a beautiful contrast with the dark brown hardwood floors – a beautiful combination that makes the space look elegant and timeless.

The modern look of the kitchen is brought by the stainless steel appliances, while the cabinets and the central island give the space a classic touch. The hub of the house enjoys a smart design and it’s both beautiful and fully functional.

Property Features

  • To be built in 2017;
  • Single Family Residential;
  • 2 story;
  • Style: Colonial Architecture.
  • 5,600 sq ft;

Appliances

Interior Amenities

  • 6 bedrooms;
  • 7.5 bathrooms;

Exterior Amenities

Location on map

See the latest updates

1 December 12, 2018
42-colt-rd-prepping-landscape
  • Preparing for pavement installation.
3 July 31, 2018
42-colt-rd-summit-porch-construction
  • Construction has started on extending the front porch;
  • James Hardie Siding and Azek trim installation continues;
  • All rough mechanical inspections have been approved.
5 May 3, 2018
42-colt-rd-exterior-siding-installation
  • Exterior siding has begun
7 April 13, 2018
42-colt-rd-pouring-basement-slab
  • Basement slab was poured
9 April 3, 2018
42-colt-rd-sheathing-completed
  • Exterior sheathing has been completed
11 March 15, 2018
42-colt-rd-framing-process1
  • Framing continues
13 February 28, 2018
42-colt-foundation-walls-installation3
  • The superior wall system has been completed
15 November 6, 2017
42-colt-rd-final-stages-of-demolition

The final stages of demolition and clean up are in progress

17 October 20, 2017
colt-road-tree-removal

The first stage of demolition has started with the tree removal

2 October 15, 2018
42-colt-rd-retaining-wall
  • The retaining walls have been completed on the exterior;
  • Final grading and installation of the mulch beds, shrubs and bluestone patio walkway is underway.
4 June 1, 2018
42-colt-rd-exterior-wrapping
  • Tyvek wrap was completed
  • Stone preparation is in progress
  • Azak, trim , columns and siding are in progress
  • Hvac , electrical and plumbing are in progress
6 April 26, 2018
42-colt-excavations
  • The excavation team is back on-site finishing grading and backfilling the garage area;
  • Plumbing and HVAC rough has begun.
8 April 10, 2018
42-colt-rd-exterior-sheathing-complete
  • Exterior sheathing has been completed
  • Window and roofing installation has begun
10 March 23, 2018
42-colt-rd-framing-process
  • Framing continues
  • Sheathing to begin
12 March 5, 2018
42-colt-rd-framing-delivery
  • First lumber delivery has arrived
14 February 21, 2018
42-colt-rd-stone-filling
  • The stone is being filled for the footing
16 October 30, 2017
42-colt-rd-demolition3
  • Demolition is almost completed
  • Excavation for the new foundation to begin
18 August 4, 2017
42-colt-rd-demolition

Ready for demolition

  • 1 December 12, 2018
    42-colt-rd-prepping-landscape
    • Preparing for pavement installation.
  • 2 October 15, 2018
    42-colt-rd-retaining-wall
    • The retaining walls have been completed on the exterior;
    • Final grading and installation of the mulch beds, shrubs and bluestone patio walkway is underway.
  • 3 July 31, 2018
    42-colt-rd-summit-porch-construction
    • Construction has started on extending the front porch;
    • James Hardie Siding and Azek trim installation continues;
    • All rough mechanical inspections have been approved.
  • 4 June 1, 2018
    42-colt-rd-exterior-wrapping
    • Tyvek wrap was completed
    • Stone preparation is in progress
    • Azak, trim , columns and siding are in progress
    • Hvac , electrical and plumbing are in progress
  • 5 May 3, 2018
    42-colt-rd-exterior-siding-installation
    • Exterior siding has begun
  • 6 April 26, 2018
    42-colt-excavations
    • The excavation team is back on-site finishing grading and backfilling the garage area;
    • Plumbing and HVAC rough has begun.
  • 7 April 13, 2018
    42-colt-rd-pouring-basement-slab
    • Basement slab was poured
  • 8 April 10, 2018
    42-colt-rd-exterior-sheathing-complete
    • Exterior sheathing has been completed
    • Window and roofing installation has begun
  • 9 April 3, 2018
    42-colt-rd-sheathing-completed
    • Exterior sheathing has been completed
  • 10 March 23, 2018
    42-colt-rd-framing-process
    • Framing continues
    • Sheathing to begin
  • 11 March 15, 2018
    42-colt-rd-framing-process1
    • Framing continues
  • 12 March 5, 2018
    42-colt-rd-framing-delivery
    • First lumber delivery has arrived
  • 13 February 28, 2018
    42-colt-foundation-walls-installation3
    • The superior wall system has been completed
  • 14 February 21, 2018
    42-colt-rd-stone-filling
    • The stone is being filled for the footing
  • 15 November 6, 2017
    42-colt-rd-final-stages-of-demolition

    The final stages of demolition and clean up are in progress

  • 16 October 30, 2017
    42-colt-rd-demolition3
    • Demolition is almost completed
    • Excavation for the new foundation to begin
  • 17 October 20, 2017
    colt-road-tree-removal

    The first stage of demolition has started with the tree removal

  • 18 August 4, 2017
    42-colt-rd-demolition

    Ready for demolition