72 Meyersville Rd

Chatham, NJ

100% complete

$1,399,000

Description

Details coming soon!

Property Features

  • To be built in 2017;
  • Single Family Residential;
  • 2 story;
  • Style: Colonial Architecture.
  • 3,800 sq ft;

Appliances

Interior Amenities

  • 5 bedrooms;
  • 5.1 bathrooms;

Exterior Amenities

Location on map

Video

See the latest updates

1 September 15, 2017
72-meyersville-rd-chatham-home-building-update-september-2017
  • Installing all electrical outlets, switches and lighting fixtures.
  • Plumbers on site to connect all appliances, faucets and water lies.
  • Landscapers installing fencing and setting the final grade for our sod and shrubs.
3 July 3, 2017
72-meyersville-updated
  • James Hardie siding is being installed;
  • The hardwood floors were installed in the interior
5 April 18, 2017
  • Excavation has been completed
  • The footing stone has been installed – inspection was scheduled
  • Superior Wall Foundation is scheduled for next week

 

2 August 25, 2017
72-meyersville-rd-exterior
  • The interior is ready to be painted
  • Landscaping to begin
4 May 18, 2017
72-meyersville-rd-chatham
  • Framing is completed
  • Backfill excavation has begun
  • Windows, doors, stairs and roofing installation will commence
1 September 15, 2017
72-meyersville-rd-chatham-home-building-update-september-2017
  • Installing all electrical outlets, switches and lighting fixtures.
  • Plumbers on site to connect all appliances, faucets and water lies.
  • Landscapers installing fencing and setting the final grade for our sod and shrubs.
2 August 25, 2017
72-meyersville-rd-exterior
  • The interior is ready to be painted
  • Landscaping to begin
3 July 3, 2017
72-meyersville-updated
  • James Hardie siding is being installed;
  • The hardwood floors were installed in the interior
4 May 18, 2017
72-meyersville-rd-chatham
  • Framing is completed
  • Backfill excavation has begun
  • Windows, doors, stairs and roofing installation will commence
5 April 18, 2017
  • Excavation has been completed
  • The footing stone has been installed – inspection was scheduled
  • Superior Wall Foundation is scheduled for next week

 