74 Fairview Ave

Chatham, New Jersey

75% complete

Description

A quiet retreat located in Chatham, New Jersey. This stunning colonial home, 74 Fairview was designed to combine luxury and comfort.

Located in a friendly neighborhood, this lovely home features modern appliances and a traditional look. The Gialluisi Custom Homes style marks its presence in every corner of the house. Hardwood floors, neutral color palettes, large windows that allow natural light to flood the rooms, unique ceiling designs and much more.

The kitchen is equipped with Wolf appliances, including a stainless steel sink, refrigerator and oven. The open plan layout unites the living room with the kitchen, turning it into the perfect place for family gatherings. The kitchen island brings extra storage

The exterior of the house features Hardi Plank siding, Azek trim and a beautiful blue stone walkway. This half acre property enjoys a beautiful landscape and the backyard is ideal for summer BBQ parties.

Property Features

  • Hardi Plank siding
  • Azek exterior trim
  • Blue stone walkway
  • Blue stone patio

Appliances

  • Wolf appliance package

Interior Amenities

  • 6 bedrooms
  • 6.5 bathrooms

Exterior Amenities

Location on map

See the latest updates

1 November 14, 2018
74-fairview-front-view-stone-porch
  • front porch block has been installed
3 April 13, 2018
74-fairview-ave-chatham-roofing-completed2
  • Cedar Shake Roofing has been completed
  • Plumbing & h v a c rough continue
  • Hardwood floor being delivered getting ready for installation
5 February 21, 2018
74-fairview-second-floor-framing
  • Second floor framing in progress
7 February 14, 2018
74-fairview-first-floor-joists
  • The first floor joists have been installed and covered with three 3/4 inch plywood sub-flooring
9 November 9, 2017
74-fairview-demolition-completed
  • Demolition completed
11 November 2, 2017
74-fairview-demolition
  • Temporary fencing has been delivered to surround the perimeter with safety fencing for demolition
2 July 31, 2018
74-fairview-siding-installation
  • Exterior trim and siding continue;
  • One of the two fireplaces and brick has been finished;
  • The township has also approved a new front porch to extend along the front elevation.
4 February 26, 2018
74-fairview-basement-slab
  • Pouring the basement slab
6 February 16, 2018
74-fairview-second-lumber-delivery
  • The first floor framing has been completed
  • The second lumber delivery has been dropped
8 February 13, 2018
74-fairview-foundation-walls-installation
  • Sill plates, rim boards and floor joists were installed
10 November 8, 2017
74-fairview-demolition4
  • Demolition has begun
12 August 4, 2017
74-fairview-chatham

Ready for demolition

  • 1 November 14, 2018
    74-fairview-front-view-stone-porch
    • front porch block has been installed
  • 2 July 31, 2018
    74-fairview-siding-installation
    • Exterior trim and siding continue;
    • One of the two fireplaces and brick has been finished;
    • The township has also approved a new front porch to extend along the front elevation.
  • 3 April 13, 2018
    74-fairview-ave-chatham-roofing-completed2
    • Cedar Shake Roofing has been completed
    • Plumbing & h v a c rough continue
    • Hardwood floor being delivered getting ready for installation
  • 4 February 26, 2018
    74-fairview-basement-slab
    • Pouring the basement slab
  • 5 February 21, 2018
    74-fairview-second-floor-framing
    • Second floor framing in progress
  • 6 February 16, 2018
    74-fairview-second-lumber-delivery
    • The first floor framing has been completed
    • The second lumber delivery has been dropped
  • 7 February 14, 2018
    74-fairview-first-floor-joists
    • The first floor joists have been installed and covered with three 3/4 inch plywood sub-flooring
  • 8 February 13, 2018
    74-fairview-foundation-walls-installation
    • Sill plates, rim boards and floor joists were installed
  • 9 November 9, 2017
    74-fairview-demolition-completed
    • Demolition completed
  • 10 November 8, 2017
    74-fairview-demolition4
    • Demolition has begun
  • 11 November 2, 2017
    74-fairview-demolition
    • Temporary fencing has been delivered to surround the perimeter with safety fencing for demolition
  • 12 August 4, 2017
    74-fairview-chatham

    Ready for demolition