832 Carleton Rd

Westfield, New Jersey

55% complete

Description

A charming retreat in one of the most beautiful towns in New Jersey.

If we were to describe this home located in Westfield, we would say it’s elegant, modern and luxurious. A dream home built to provide comfort and functionality.

The house features six bedrooms and six bathrooms. The 4,000 sq ft were carefully divided in a smart design that makes great use of all the available space. Some of the features that make this home unique are the hardwood floors, the stainless steel appliances and the crown molding.

The backyard and the front yard enjoy a beautiful landscape.

Property Features

  • 6 bedrooms
  • 6 bathrooms
  • 4,000 sq ft

Appliances

Location on map

See the latest updates

1 June 12, 2018
832-Carleton-front-view-exterior-siding
  • Cultered stone in progress
  • Electrical rough and service inspection passed
  • Framing and firestop Inspection passed
  • AV rough being completed
  • Insulation on site to be installed
  • Hvac rough complete
  • Custom front portaco finished
  • Basement custom walkout, azak and trim finished
3 March 27, 2018
832-carleton-rd-sheathing-completed1
  • Sheathing has been completed
5 February 28, 2018
832-carleton-framing-process2
  • The first floor deck, sill plates, joists ,and plywood floors are done.
7 February 23, 2018
832-carleton-rd-first-lumber-delivery1
  • The first lumber delivery has arrived
9 February 14, 2018
832-carleton-pouring-foundation
  • Footing stone in progress
11 October 26, 2017
832-carleton-rd-constructoin-fencing-installed1
  • Construction fencing installed
  • Temporary electrical pole installed
  • Demolition and excavation to begin
2 June 1, 2018
832-carleton-rd-exterior-siding-installation
  • Plumbing rough Inspection passed
  • Fire inspection passed
  • Hvac rough completed
  • Finishing AV and electrical rough
  • Concrete poured in the garage & front porch
  • Fireplaces installed
4 March 15, 2018
832-carleton-rd-framing
  • Framing continues
6 February 26, 2018
832-carleton-rd-westfield-framing-process
  • Framing process has started
8 February 22, 2018
832-carleton-installing-foundation-walls2
  • Superior Walls foundation installed
10 December 11, 2017
832-carleton-demolition1
  • Trees were removed
  • Demolition in progress
  • 1 June 12, 2018
    832-Carleton-front-view-exterior-siding
    • Cultered stone in progress
    • Electrical rough and service inspection passed
    • Framing and firestop Inspection passed
    • AV rough being completed
    • Insulation on site to be installed
    • Hvac rough complete
    • Custom front portaco finished
    • Basement custom walkout, azak and trim finished
  • 2 June 1, 2018
    832-carleton-rd-exterior-siding-installation
    • Plumbing rough Inspection passed
    • Fire inspection passed
    • Hvac rough completed
    • Finishing AV and electrical rough
    • Concrete poured in the garage & front porch
    • Fireplaces installed
  • 3 March 27, 2018
    832-carleton-rd-sheathing-completed1
    • Sheathing has been completed
  • 4 March 15, 2018
    832-carleton-rd-framing
    • Framing continues
  • 5 February 28, 2018
    832-carleton-framing-process2
    • The first floor deck, sill plates, joists ,and plywood floors are done.
  • 6 February 26, 2018
    832-carleton-rd-westfield-framing-process
    • Framing process has started
  • 7 February 23, 2018
    832-carleton-rd-first-lumber-delivery1
    • The first lumber delivery has arrived
  • 8 February 22, 2018
    832-carleton-installing-foundation-walls2
    • Superior Walls foundation installed
  • 9 February 14, 2018
    832-carleton-pouring-foundation
    • Footing stone in progress
  • 10 December 11, 2017
    832-carleton-demolition1
    • Trees were removed
    • Demolition in progress
  • 11 October 26, 2017
    832-carleton-rd-constructoin-fencing-installed1
    • Construction fencing installed
    • Temporary electrical pole installed
    • Demolition and excavation to begin